BPMN Training Part 1: Process Model, Pool
Chapter Overview
In this training chapter you get familiar with the process model and the pool element, which are the major components of the BPMN standard.
-
A process model always consists of one pool element.
-
The pool represents the execution context for a process and is structured into lanes.
-
Each lane specifies the potential owner for the process execution within a lane context.
Sample BPMN Process Model
Process Explanation:
-
The pool consists of three lanes with the following potential owners for the process execution
-
System
-
TeamA
-
TeamB
-
At the top of the pool the name of the process should be specified
-
At the left side of the pool the responsible organization of the process should be specified
Remark: The name of a lane must not contain any special character or blank, if the process is published into the Camunda process engine.

